§ 63.2860 What notifications must I submit and when?
You must submit the one-time notifications listed in paragraphs (a) through (d) of this section to the responsible agency:
(a) Initial notification for existing sources. For an existing source, submit an initial notification to the agency responsible for these NESHAP no later than 120 days after the effective date of this subpart, or no later than 120 days after the source becomes subject to this subpart, whichever is later. In the notification, include the items in paragraphs (a)(1) through (5) of this section:
(1) The name and address of the owner or operator.
(2) The physical address of the vegetable oil production process.
(3) Identification of the relevant standard, such as the vegetable oil production NESHAP, and compliance date.
(4) A brief description of the source including the types of listed oilseeds processed, nominal operating capacity, and type of desolventizer(s) used.
(5) A statement designating the source as a major source of HAP or a demonstration that the source meets the definition of an area source. An area source is a source that is not a major source and is not collocated within a plant site with other sources that are individually or collectively a major source.
(b) Initial notifications for new and reconstructed sources. New or reconstructed sources must submit a series of notifications before, during, and after source construction per the schedule listed in § 63.9. The information requirements for the notifications are the same as those listed in the General Provisions with the exceptions listed in paragraphs (b)(1) and (2) of this section: