§ 63.8575 What do I need to know about operation, maintenance, and monitoring plans?
(a) For each affected source that is subject to the emission limits specified in Table 1 to this subpart, you must prepare, implement, and revise as necessary an OM&M plan that includes the information in paragraph (b) of this section. Your OM&M plan must be available for inspection by the delegated authority upon request.
(b) Your OM&M plan must include, as a minimum, the information in paragraphs (b)(1) through (13) of this section.
(1) Each process and APCD to be monitored, the type of monitoring device that will be used, and the operating parameters that will be monitored.
(2) A monitoring schedule that specifies the frequency that the parameter values will be determined and recorded.
(3) The limits for each parameter that represent continuous compliance with the emission limitations in § 63.8555. The limits must be based on values of the monitored parameters recorded during performance tests.
(4) Procedures for the proper operation and routine and long-term maintenance of each APCD, including a maintenance and inspection schedule that is consistent with the manufacturer's recommendations.