§ 63.11562 What are my initial compliance requirements?
(a) For asphalt processing operations, you must:
(1) Demonstrate initial compliance with the emission limits specified in Table 1 of this subpart by:
(i) Conducting emission tests using the methods specified in Table 3 of this subpart; or
(ii) Using the results of a previously-conducted emission test as specified in paragraph (d) of this section.
(2) Establish the value or range of values of the operating parameters specified in Table 4 of this subpart:
(i) Using the operating parameter data recorded during the compliance emission tests; or
(ii) Using the operating parameter data recorded during a previously-conducted emission test.
(b) For asphalt roofing manufacturing lines that use a control device to comply with the emission limits in Table 2 of this subpart, you must:
(1) Demonstrate initial compliance by:
(i) Conducting emission tests using the methods specified in Table 3 of this subpart; or
(ii) Using the results of a previously-conducted emission test as specified in paragraph (d) of this section.
(2) Establish the value of the operating parameter specified in Table 4 of this subpart for thermal oxidizers:
(i) Using the operating parameter data recorded during the compliance emission tests; or
(ii) Using the operating parameter data recorded during a previously-conducted emission test.
(3) Establish the value or range of values of the operating parameters specified in Table 4 of this subpart for control devices other than thermal oxidizers: