Don't show this message again
§ 761.212 Transporter compliance with the manifest.
(a) The transporter must deliver the entire quantity of PCB waste which he has accepted from a generator or a transporter to:
(1) The designated facility listed on the manifest; or
(2) The alternate designated facility, if the PCB waste cannot be delivered to the designated facility because an emergency prevents delivery; or
(3) The next designated transporter.
(b)
(1) If the PCB waste cannot be delivered in accordance with paragraph (a) of this section because of an emergency condition other than rejection of the waste by the designated facility, then the transporter must contact the generator for further directions and must revise the manifest according to the generator's instructions.