§ 60.274b Monitoring of operations.
(a) The owner or operator subject to the provisions of this subpart shall maintain records of the following information:
(1) All data obtained under paragraph (b) of this section; and
(2) All monthly operational status inspections performed under paragraph (c) of this section.
(b) Except as provided under paragraph (e) of this section, the owner or operator subject to the provisions of this subpart shall conduct the following monitoring of the capture system to demonstrate continuous compliance:
(1) If a DEC system is in use, according to paragraph (f) of this section, monitor and record on a continuous basis the furnace static pressure and any one of (2) through (4) in this paragraph:
(2) Monitor and record the fan motor amperes at each damper position, and damper position consistent with paragraph (h)(5) of this section;
(3) Install, calibrate, and maintain a monitoring device that continuously records the volumetric air flow rate or static pressure at each separately ducted hood; or
(4) Install, calibrate, and maintain a monitoring device that continuously records the volumetric flow rate at the control device inlet and monitor and record the damper position consistent with paragraph (h)(5) of this section.
(5) The static pressure monitoring device(s) shall be installed in an EAF or DEC duct prior to combining with other ducts and prior to the introduction of ambient air, at a location that has no flow disturbance due to the junctions.
(6) The volumetric flow monitoring device(s) may be installed in any appropriate location in the capture system such that reproducible flow rate monitoring will result. The flow rate monitoring device(s) shall have an accuracy of ±10 percent over its normal operating range and shall be calibrated according to the manufacturer's instructions. The Administrator may require the owner or operator to demonstrate the accuracy of the monitoring device(s) relative to EPA Methods 1 and 2 of appendix A of this part.