§ 264.223 Response actions.
(a) The owner or operator of surface impoundment units subject to § 264.221 (c) or (d) must have an approved response action plan before receipt of waste. The response action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a minimum, the response action plan must describe the actions specified in paragraph (b) of this section.
(b) If the flow rate into the leak detection system exceeds the action leakage rate for any sump, the owner or operator must: