Don't show this message again
§ 147.3015 Information to be considered for Class III wells.
(a) In addition to the requirements of § 146.34(a) of this chapter, the following information shall be considered by the Director:
(1) Proposed construction procedures, including a cementing and casing program, logging procedures, deviation checks, and a drilling, testing and coring program.