§ 1051.345 What production-line testing records must I send to EPA?
(a) Within 30 calendar days of the end of each test period, send us a report with the following information:
(1) Describe any facility used to test production-line vehicles or engines and state its location.
(2) State the total U.S.-directed production volume and number of tests for each engine family.
(3) Describe how you randomly selected vehicles or engines.
(4) Describe each test vehicle or engine, including the engine family's identification and the vehicle's model year, build date, model number, identification number, and number of hours of operation before testing.
(5) Identify how you accumulated hours of operation on the vehicles or engines and describe the procedure and schedule you used.