Don't show this message again
§ 57.705 Contents of SIP Compliance Schedule required by § 57.201(d) (2) and (3).
This section applies to smelters which are required to submit a SIP Compliance Schedule as discussed below.
(a) Each SIP Compliance Schedule required by § 57.201(d) (2) and (3) must contain the following elements:
(1) Description of the overall design of the SO2 control system(s) to be installed;