§ 52.1880 Control strategy: Particulate matter.
(a) The requirements of subpart G of this chapter are not met because the Ohio plan does not provide for attainment and maintenance of the secondary standards for particulate matter in the Greater Metropolitan Cleveland Intrastate Region and the Ohio portions of the Northwest Pennsylvania-Youngstown and the Steubenville-Weirton-Wheeling Interstate Regions.
(b) In Pickaway County, Columbus and Southern Ohio Electric Company, or any subsequent owner or operator of the Picway Generating Station, shall not operate simultaneously Units 3 and 4 (boilers 7 and 8) at any time. These units will terminate operation no later than October 1, 1980.
(c) Ohio Regulation EP–12 (open burning) is disapproved insofar as EP–12–03(D)(1) and EP–12–04(D)(1) allow open burning of hazardous or toxic materials.
(d)–(f) [Reserved]
(g) The B.F. Goodrich Chemical Plant State Implementation Plan revision is being disapproved because it is not supported by an adequate attainment demonstration and therefore does not meet the requirements of § 51.13(e).
(h) Approval. On January 4, 1989, the State of Ohio submitted a committal SIP for particulate matter with an aerodynamic diameter equal to or less than 10 micrometers (PM10) for Ohio's Group II areas. The Group II areas of concern are in Belmont, Butler, Columbiana, Franklin, Hamilton, Lorain, Mahoning, Montgomery, Richland, Sandusky, Scioto, Seneca, Stark, Summit, Trumbull, and Wyandot Counties. The committal SIP contains all the requirements identified in the July 1, 1987, promulgation of the SIP requirements for PM10 at 52 FR 24681.
(i) Part D—Disapproval—Ohio's Part D TSP plan for the Middletown area is disapproved. Although USEPA is disapproving the plan, the emission limitations and other requirements in the federally approved SIP remain in effect. See § 52.1870(c)(27).
(j) Approval—EPA is approving the PM10 maintenance plan for Cuyahoga and Jefferson Counties that Ohio submitted on May 22, 2000, and July 13, 2000.
(k) Determinations of Attainment. EPA has determined, as of November 20, 2009, the Parkerburg-Marietta, WV-OH and the Wheeling, WV-OH PM2.5 nonattainment areas have attained the 1997 PM2.5 NAAQS. These determinations, in accordance with 40 CFR 52.1004(c), suspend the requirements for these areas to submit an attainment demonstration, associated reasonably available control measures, a reasonable further progress plan, contingency measures, and other planning SIPs related to attainment of the standard for as long as these areas continue to meet the 1997 PM2.5 NAAQS.
(l) Disapproval. EPA is disapproving the portions of Ohio's Infrastructure SIP for the 2006 24-hour PM2.5 NAAQS addressing interstate transport, specifically with respect to section 110(a)(2)(D)(i)(I).