In-line blending.

§ 1090.1315 In-line blending.

A fuel manufacturer using in-line blending equipment may qualify for a waiver from the requirement in § 1090.1310(b) to test every batch of fuel before the fuel leaves the fuel manufacturing facility as follows:

(a) Submit a request signed by the RCO to EPA with the following information:

(1) Describe the location of your in-line blending operation, how long it has been in operation, and how much of each type and grade of fuel you have blended over the preceding 3 years (or since starting the in-line blending operation if it is less than 3 years). Describe the physical layout of the blending operation and how you move the blended fuel into distribution. Also describe how your automated system monitors and controls blending proportions and the properties of the blended fuel. For new installations, describe these as a planned operation with projected volumes by type and grade. Describe clearly which portions of your blending operation are the subject of your waiver request.

This document is only available to subscribers. Please log in or purchase access.