§ 60.633 Exceptions.
(a) Each owner or operator subject to the provisions of this subpart may comply with the following exceptions to the provisions of subpart VV.
(b)
(1) Each pressure relief device in gas/vapor service may be monitored quarterly and within 5 days after each pressure release to detect leaks by the methods specified in § 60.485(b) except as provided in §§ 60.632(c), paragraph (b)(4) of this section, and 60.482–4 (a) through (c) of subpart VV.
(2) If an instrument reading of 10,000 ppm or greater is measured, a leak is detected.
(3)
(i) When a leak is detected, it shall be repaired as soon as practicable, but no later than 15 calendar days after it is detected, except as provided in § 60.482–9.