§ 63.1311 Compliance dates and relationship of this subpart to existing applicable rules.
(a) Affected sources are required to achieve compliance on or before the dates specified in paragraphs (b) through (d) of this section. Paragraph (e) of this section provides information on requesting compliance extensions. Paragraphs (f) through (n) of this section discuss the relationship of this subpart to subpart A of this part and to other applicable rules. Where an override of another authority of the Act is indicated in this subpart, only compliance with the provisions of this subpart is required. Paragraph (o) of this section specifies the meaning of time periods.
(b) New affected sources that commence construction or reconstruction after March 29, 1995 shall be in compliance with this subpart (except § 63.1331(a)(9)(iii)) upon initial start-up or by June 19, 2000, whichever is later, except that new affected sources whose primary product, as determined using the procedures specified in § 63.1310(f), is PET shall be in compliance with § 63.1331 (except § 63.1331(a)(9)(iii)) upon initial start-up or August 6, 2002, whichever is later. New affected sources that commenced construction or reconstruction after March 25, 1995, but on or before January 9, 2012, shall be in compliance with the pressure relief device monitoring requirements of § 63.1331(a)(9)(iii) no later than March 27, 2017. New affected sources that commenced construction or reconstruction after January 9, 2012, shall be in compliance with the pressure relief device monitoring requirements of § 63.1331(a)(9)(iii) upon initial startup or by March 27, 2014, whichever is later.
(c) Existing affected sources shall be in compliance with this subpart (except for § 63.1331 for which compliance is covered by paragraph (d) of this section) no later than June 19, 2001, as provided in § 63.6(c), unless an extension has been granted as specified in paragraph (e) of this section, except that the compliance date for the provisions contained in § 63.1329 is extended to March 27, 2014, for existing affected sources whose primary product, as determined using the procedures specified in § 63.1310(f), is PET using a continuous terephthalic acid high viscosity multiple end finisher process.
(d) Except as provided for in paragraphs (d)(1) through (7) of this section, existing affected sources shall be in compliance with § 63.1331 no later than June 19, 2001, unless an extension has been granted pursuant to paragraph (e) of this section.
(1) Compliance with the compressor provisions of § 63.164 shall occur no later than February 27, 1998, for any compressor meeting one or more of the criteria in paragraphs (d)(1)(i) through (d)(1)(iv) of this section, if the work can be accomplished without a process unit shutdown:
(i) The seal system will be replaced;
(ii) A barrier fluid system will be installed;
(iii) A new barrier fluid will be utilized which requires changes to the existing barrier fluid system; or
(iv) The compressor will be modified to permit connecting the compressor to a fuel gas system or a closed vent system or modified so that emissions from the compressor can be routed to a process.
(2) Compliance with the compressor provisions of § 63.164 shall occur no later than March 12, 1998 for any compressor meeting all the criteria in paragraphs (d)(2)(i) through (d)(2)(iv) of this section: