§ 96.188 CAIR NOX allowance allocations to CAIR NOX opt-in units.
(a) Timing requirements. (1) When the CAIR opt-in permit is issued under § 96.184(e), the permitting authority will allocate CAIR NOX allowances to the CAIR NOX opt-in unit, and submit to the Administrator the allocation for the control period in which a CAIR NOX opt-in unit enters the CAIR NOX Annual Trading Program under § 96.184(g), in accordance with paragraph (b) or (c) of this section.
(2) By no later than October 31 of the control period after the control period in which a CAIR NOX opt-in unit enters the CAIR NOX Annual Trading Program under § 96.184(g) and October 31 of each year thereafter, the permitting authority will allocate CAIR NOX allowances to the CAIR NOX opt-in unit, and submit to the Administrator the allocation for the control period that includes such submission deadline and in which the unit is a CAIR NOX opt-in unit, in accordance with paragraph (b) or (c) of this section.
(b) Calculation of allocation. For each control period for which a CAIR NOX opt-in unit is to be allocated CAIR NOX allowances, the permitting authority will allocate in accordance with the following procedures:
(1) The heat input (in mmBtu) used for calculating the CAIR NOX allowance allocation will be the lesser of: