Model Rule—Initial Compliance Requirements
- §60.5185 How and when do I demonstrate initial compliance with the emission limits and standards?
- §60.5190 How do I establish my operating limits?
- §60.5195 By what date must I conduct the initial air pollution control device inspection and make any necessary repairs?
- §60.5200 How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection, and ash handling systems, and by what date must I conduct an initial performance evaluation?