Subpart B—Calculating the High-Wage Component of Material and Manufacturing Expenditures
- §810.100 Scope and purpose of this subpart.
- §810.105 Calculating the average hourly base wage rate.
- §810.110 Examples of direct production work.
- §810.115 Paid meal time and paid break time.
- §810.120 Part-time, temporary, seasonal, and contract workers.
- §810.125 Workers paid on a non-hourly basis.
- §810.130 Executive, Management, Research and Development, Engineering, and Other Personnel.
- §810.135 Interns, students, and trainees.
- §810.140 High-wage transportation or related costs for shipping a high-wage part or material.
- §810.145 Currency exchange.
- §810.150 Adjustment of the average hourly base wage rate.